DXC—200PRO ALL-ELECTRIC DESKTOP INJECTION MOLDING

SMALL BATCH. FULL FORCE.

A bench-scale, all-electric injection molding machine for prototypes, R&D and low-volume production—without a hydraulic power pack.

1100W
AC110V / AC220V
50g
Maximum shot*
4
Barrel heating zones
PRODUCT VISUALIZATION FORM STUDY / 01
Digital product visualization—not a filmed molding or acoustic test. Final appearance and configuration may vary.
80T THEORETICAL
CLAMP FORCE

Start with a request, not a payment. Your configuration, price and delivery terms are confirmed in a proforma invoice first.

PAYMENT LOGIC
BUILT FOR PROTOTYPING R&D EDUCATION LOW-VOLUME PRODUCTION
01THE MACHINE

A compact footprint.
A complete molding workflow.

Clamping, plasticizing, injection, cooling and process control—integrated into one all-electric bench-scale system.

TOGGLE-LINK CLAMPING
80T

Theoretical clamping force.

The 80T figure describes the theoretical force of the toggle mechanism. Mold, material and process suitability must be confirmed for each application.

FORCE / DESIGN RATING
01

Rotary-feed injection

Rotary feeding with ejection-style injection. Up to 50g per shot, depending on material and processing conditions.

02

Four-zone thermal control

Four barrel heating zones plus a barrel drying function support controlled material preparation.

03

Active water cooling

An 18L water tank and 360° water-cooling system with dual active heat-dissipation circuits.

04

Integrated machine control

STM32 control board, 7-inch touchscreen, material-runout detection and a tri-color status light.

05

Safety and extraction, built in

A side-sliding safety door and dedicated exhaust fans for the heating and mold-opening areas. Exhaust routing and facility ventilation must be assessed for the material being processed.

06

Quiet by architecture.

All-electric operation means no hydraulic pump or hydraulic oil. “Quiet” describes the design intent; no dB(A) rating is claimed without a verified acoustic test report.

Built to iterate, not to guess.

Share your part drawing, target material, part weight and mold details before ordering. We confirm application fit and FAT criteria in writing; a machine specification alone cannot guarantee your part result.

02TECHNICAL SPECIFICATION

The numbers.
With the context intact.

Final configuration and destination-specific requirements are confirmed before the production deposit.

DXC-200Pro technical specifications
ModelDXC-200Pro
Machine dimensions1930.6 × 446.6 × 959.4 mm (L × W × H)
Total power1100W · AC110V / AC220V
Barrel heating4 independently zoned sections
Clamping structureToggle-link mechanism · theoretical 80T
Injection methodRotary feeding with ejection-style injection
Maximum shot volumeUp to 50g per shot; material-dependent
Mold coolingWater-cooled · 18L tank · 360° dual active heat-dissipation circuits
ControllerSTM32 MCU board · 7-inch touchscreen
Monitoring & indicationMaterial-runout detection · tri-color status light
Additional functionsBarrel drying · side-sliding safety door · heating and mold-area exhaust fans

* 50g is a maximum design figure, not a universal rating for every polymer. Actual shot capability and part results vary with material density, formulation, mold and process. Machine dimensions are not shipping dimensions.

Compliance scope is reviewed for the destination and final configuration before order acceptance. CE, UKCA, UL or any other certification is not implied by this page and must be expressly documented when applicable.

03PRESALE, STEP BY STEP

Seven clear steps.
No surprise payment.

You approve the machine, the commercial terms and the factory acceptance result before the final balance is due.

TO REQUEST0

No online charge

Create a request for free. This website does not collect card or bank payments.

TO START PRODUCTION30%

Production deposit

Due only after you receive, verify and accept the proforma invoice (PI).

TO RELEASE SHIPMENT70%

Final balance

Due after FAT approval and balance invoice, before handover to the carrier.

  1. 01
    FREE REQUEST / NO ORDER YET

    Tell us what you want to mold.

    Create your presale request with destination, voltage, quantity, part and material details. A request is not an accepted order and triggers no payment.

    YOU RECEIVE

    Application review and a route to a formal quotation.

  2. 02
    REVIEW / VERIFY / ACCEPT

    Receive your proforma invoice.

    The PI states machine price, currency, configuration, FCA or DAP named place, freight scope, estimated production window and long-stop date, payment details, FAT scope, warranty and cancellation terms. Your order exists only after written acceptance and our written confirmation.

    CHECK FIRST

    Beneficiary, total landed-cost scope, dates and refund terms.

  3. 03
    30% PRODUCTION DEPOSIT

    Pay against the verified PI.

    Use only the bank transfer or agreed escrow route stated in the PI. Include the PI reference and keep your remittance receipt. The production clock starts only when the deposit has cleared and the configuration is frozen in writing.

    PRODUCTION STARTS

    Cleared deposit + written configuration freeze.

  4. 04
    BUILD / TEST / APPROVE

    Follow production and complete FAT.

    Receive production updates, then a remote factory acceptance test (FAT) or the agreed on-site FAT. We record the agreed checklist, results and open items. Do not pay the balance against an unapproved or unresolved FAT.

    YOUR CHECKPOINT

    Written FAT record and resolution of open items.

  5. 05
    70% FINAL BALANCE

    Approve, then pay the balance.

    After FAT approval, you receive the balance invoice with a due date. Pay 70% using the verified PI payment route. The machine is released to the carrier after cleared funds and logistics readiness.

    SHIPMENT GATE

    FAT approval + cleared balance + dispatch release.

  6. 06
    PACK / SHIP / CLEAR

    Track dispatch and import delivery.

    We provide the agreed dispatch documents and available tracking. Carrier transit and customs time are separate from production time. Import clearance, duties and taxes remain yours under both FCA and DAP unless the PI expressly says otherwise.

    YOU RECEIVE

    Packing, dispatch and tracking information as agreed.

  7. 07
    INSPECT / COMMISSION / SUPPORT

    Inspect, onboard and start molding.

    Check the shipment at arrival, document any exceptions and follow the installation and safety instructions. Remote onboarding, fault diagnosis and the limited warranty process continue after delivery.

    AFTER DELIVERY

    Onboarding, technical support and warranty route.

The signed or otherwise accepted PI is the controlling commercial document. It replaces website estimates or general terms where it contains a specific, agreed provision.

!PAYMENT SECURITY

Verify the invoice.
Then move money.

  • Match the beneficiary’s legal name to the PI. Never pay to an unrelated personal account.
  • Treat bank-detail changes as high risk: verify through an existing known contact and a second communication channel.
  • Use only the payment method written in the PI. No card payment is processed on this website.
  • Keep the remittance confirmation. “Sent” is not “received”; production timing starts after cleared funds.
Read cancellation & refund rules
04DELIVERY & CUSTOMS

From our floor
to your door—or carrier.

Choose one trade term and one precise named place in the PI. “Worldwide shipping” alone is not a delivery term.

FCAFREE CARRIER / NAMED PLACE

You control the main carriage.

DXC handles
Export clearance and delivery to your appointed carrier at the agreed named place.
You handle
Main carriage, cargo insurance decision, import clearance, duties, taxes and unloading/onward delivery.
Risk transfers
When the goods are delivered to the carrier at the FCA named place, under Incoterms® 2020.
DAPDELIVERED AT PLACE / NAMED DESTINATION

DXC arranges the main carriage.

DXC handles
Export clearance and main carriage to the agreed named destination, ready for unloading.
You handle
Import clearance, import duties and taxes, and unloading unless the PI expressly allocates unloading differently.
Risk transfers
When the goods are placed at your disposal at the DAP destination, ready for unloading, under Incoterms® 2020.

DAP is not DDP. Import duties and taxes are not included in DAP. Destination feasibility and any restricted locations are confirmed before deposit.

01 / PACK

Freight details before deposit

Export packaging, packed dimensions, gross weight and freight charges are confirmed in the PI or referenced quotation. Never plan freight from machine-only dimensions.

02 / DOCS

Documents & import review

Commercial invoice, packing list, transport document and other agreed documents are supplied as applicable. Your customs broker confirms HS classification and local import requirements.

03 / ARRIVE

Inspect before you sign

Where possible, inspect packaging and visible machine condition before signing. Record exceptions on the delivery receipt and take an uninterrupted unboxing video.

04 / REPORT

Report transit damage promptly

Notify visible damage or shortage promptly, preferably within 48 hours. Keep all packaging and evidence. Carrier investigation and the agreed remedy follow; never return the machine without a written RMA.

What “lead time” actually means

Production lead time starts only after the deposit clears and configuration is frozen. The PI states the estimated ship window and a long-stop date. Carrier transit and customs clearance are not included unless expressly stated. We communicate material delays and a revised plan; the long-stop cancellation right below protects you if we cannot deliver for reasons within our control.

05AFTER-SALES SUPPORT

Support does not end
at the loading dock.

A clear route from first inspection to remote diagnosis, parts and approved repair.

01

Submit evidence

Provide PI number, machine serial number, fault description, settings, photos/video and any alarm information.

02

Isolate & diagnose

For a safety concern, stop and isolate power first. We use guided checks to identify the cause; target acknowledgement is two business days.

03

Approve the remedy

Remote guidance, covered replacement part, approved repair or other remedy is confirmed before work or shipment.

04

Verify & close

Run the agreed verification test, retain service records and close the case only after the remedy is documented.

STANDARD LIMITED WARRANTY
12MONTHS

From documented delivery, unless a different period is expressly stated in your PI. Covers verified defects in materials or workmanship under normal use and approved processing conditions.

What DXC covers

  • Remote fault diagnosis and operating guidance.
  • Replacement or repair of confirmed covered defective parts.
  • Standard outbound shipping for confirmed warranty replacement parts.

What is not covered

  • Normal wear, consumables and routine maintenance.
  • Incorrect voltage, misuse, unsafe operation, inadequate cooling or unapproved materials.
  • Unauthorized modification or repair, accident, force majeure or cosmetic marks that do not affect function.
  • A guaranteed part result, cycle time, output or mold compatibility not accepted in writing.

You perform safe, guided replacement and any destination import charges for warranty parts unless mandatory law or the PI says otherwise. Expedited freight and on-site service are optional, pre-approved and separately quoted. DXC may repair, replace parts, replace the machine or refund the affected machine where a verified covered defect cannot be reasonably resolved, subject to the PI and applicable law.

06CANCELLATION & REFUNDS

Know the exit points
before you enter.

The standard rules below apply when incorporated into your PI. Mandatory consumer or local rights, where applicable, are not excluded.

WHENWHAT HAPPENS
Before accepting the PICancel freely. No payment is due and no order exists.
After deposit, before configuration freezeYou may cancel for a full deposit refund, less only disclosed, non-recoverable bank or escrow charges. No production cancellation penalty applies.
After configuration freezeCancellation requires review. Documented, non-recoverable production, customization and committed logistics costs may be deducted as stated in the PI and permitted by law. The 30% deposit is not automatically forfeited; any remaining refundable amount is returned.
FAT does not meet the agreed criteriaDo not pay the final balance. DXC must correct and repeat the FAT. If a material nonconformity remains unresolved, you may cancel the undelivered machine and receive a full refund of amounts paid for it.
DXC cannot supply or misses the PI long-stop dateFor reasons within DXC’s control, you may cancel the undelivered machine and receive a full refund of amounts paid for it. Buyer-caused changes, delayed approvals and agreed force-majeure handling remain governed by the PI.
After shipment or for change of mindReturns are not automatic because cross-border freight, customs and configuration costs apply. Defects follow the warranty and RMA route; any discretionary return requires written approval and a stated deduction and freight schedule.
REFUND METHOD

Approved refunds are returned to the original payer through the original payment route and in the PI currency. Processing is initiated within 10 business days of written approval; bank posting time, correspondent-bank charges and exchange-rate differences outside DXC’s control may affect receipt. No refund is made to an unrelated third-party account.

07BEFORE YOU ASK

Straight answers.
No hidden asterisks.

Still application-specific? Include the details in your request and get the answer written into your technical agreement or PI.

Ask with a presale request
Does submitting a request create an order or charge me?

No. It creates a request summary only. No payment is taken. An order requires PI acceptance and written order confirmation; production requires cleared deposit and configuration freeze.

What is the machine price?

There is no universal checkout price on this page. Your quotation identifies the machine configuration, quantity, currency, packaging, trade term and freight scope. Review the full PI before paying any deposit.

Exactly when is the 70% balance due?

After you approve the agreed FAT and receive the balance invoice, and before the machine is released to the carrier. The invoice states the exact due date. An unresolved FAT is not a valid reason to rush the balance.

Is 80T a measured production rating?

80T is the theoretical clamping force of the toggle-link structure. Application suitability and any verified test values must be documented separately; do not treat the theoretical figure as a guarantee for every mold.

Will every material reach a 50g shot?

No. Up to 50g is material- and process-dependent. Density, formulation, feeding, temperature and mold conditions affect actual results. Submit the exact material grade and part weight for review.

What does “quiet” mean without a dB(A) figure?

The all-electric architecture avoids a hydraulic power pack, which removes that noise source and hydraulic oil. It does not establish a measured workplace noise rating. Request an acoustic test report if a numerical limit matters to your facility.

Can DXC confirm my mold, material and part before payment?

Yes—provide drawings, mold interface details, material grade, part weight and target output. Feasibility, any required trial and FAT acceptance criteria must be agreed in writing. A verbal “should work” is not an acceptance criterion.

Are CE, UKCA or UL certifications included?

No certification is implied by this website. Required electrical, EMC, machinery and market-entry documents are reviewed for the destination and final configuration, then expressly listed in the technical agreement or PI where available.

Who pays customs duties and import taxes?

You do under both FCA and DAP, unless your PI expressly offers a different term. DAP includes main carriage to the named destination, not import duty/tax payment or import clearance by DXC.

What if the machine arrives damaged?

Record exceptions on the delivery receipt where possible, photograph the packaging and machine, keep all packaging and notify us promptly—preferably within 48 hours. Do not return anything until you receive a written RMA and shipping instructions.

Can I attend the FAT?

Remote FAT with an agreed checklist is the standard route. On-site witness testing may be offered where feasible and must be scheduled and costed in the PI. Either route ends with a written record and open-item resolution.

Is the estimated delivery date guaranteed?

The PI separates the production ship window from carrier transit and customs time. It also states a long-stop date and the related cancellation right. Dates are not calculated from your website request; they start from cleared deposit plus configuration freeze.

08START YOUR PRESALE

Let’s configure
your first batch.

Tell us where you are, what you want to mold and how you want it delivered. Get a configuration and PI—not a surprise card charge.

WHAT HAPPENS NEXT
  1. Create and send your request.
  2. Receive application review and quotation.
  3. Verify the PI before any 30% deposit.

No online payment. No card details. No automatic order. No production start.

PRESALE REQUEST / ENQUIRYPAYMENT: NONE

This static website does not transmit your data. Your draft is saved only in this browser. Create the request, then send it to your authorized DXC sales contact.